Standardised commissioning across every gigafactory you build.

Battery and energy manufacturers are building at a pace heavy industry has never attempted: gigafactories in parallel, on multiple continents, with equipment from a young and stretched vendor ecosystem. Every site must commission enormous, novel production lines — and the companies building them are scaling their teams as fast as their factories.

The struggle

What makes readiness hard here

Struggle

Parallel builds, divergent execution

Each site develops its own commissioning habits — quality and pace vary with local leadership.

Struggle

A young vendor ecosystem

Equipment suppliers at every maturity level, delivering documentation of every quality level.

Struggle

Teams built mid-flight

Thousands of engineers hired during the build — most commissioning a factory for the first time.

Struggle

Ramp economics

Offtake agreements and vehicle programmes depend on cells flowing on date; commissioning slip lands directly on customers.

The opportunity

Where the leverage is

The multi-site builder has an advantage no single-project owner has: repetition. Encode the commissioning playbook once and every subsequent site executes it — same packages, same scripts, same readiness definitions, same dashboards. Site two starts where site one finished learning, and the gap between best and worst site closes to nothing.

With Rowsys

What changes

The playbook, platformised
Standard package structures, script libraries and workflows deployed to every site — commissioning becomes a repeatable product. Protocol Builder
Vendor output on your standard
Suppliers execute and document on your platform, to your definitions of done — regardless of their internal maturity. Mobile Execution
First-timers guided to expert standard
Step-by-step execution turns new hires into consistent performers from their first week on site. Mobile Execution
Fleet-level readiness
Every site on the same dashboards — leadership compares progress across the fleet on one scale and moves resources with confidence. Readiness Dashboards

Outcomes

What you get

  • Every facility commissioned to one standard
  • Vendor documentation quality controlled at the source
  • Each new site faster than the last
  • Ramp commitments protected by live, comparable visibility

Not sure where you stand? Take the 3-minute readiness assessment

Direct answers

Battery & Energy — common questions

Can Rowsys roll out to multiple concurrent sites?

Yes — that is the core multi-site pattern: a central standard configuration deployed per site, with fleet-level reporting across all of them. New sites inherit the playbook on day one.

How does Rowsys handle equipment vendors with weak documentation practices?

Vendors execute on Rowsys against your templates, so required entries, photos and sign-offs are enforced by the system at the point of work. Documentation quality stops depending on the vendor's back office.