TOOL-02 · ROI Calculator

What is the coordination tax costing you?

Two numbers dominate the economics of operational readiness: the engineering hours consumed by manual administration, and the value at stake in startup delay. Put your own figures on both — every assumption is shown and adjustable.

Calculator

Trackers, matrices, transcription, signature chasing, report building. Industry norm: 25–40%.

Lost production margin, financing cost, or contractual penalty per day — whichever your business counts.

Days lost to documentation, approvals and evidence issues — not construction.

Your annual exposure

—

Recoverable administrative engineering hours per year (at a conservative 60% reduction)

—

Value of those hours at your loaded rate

—

Startup-delay value at stake across your annual programme

—

Indicative value of recovering 10–25% of readiness-driven delay

Estimates only, computed in your browser from your inputs — nothing is sent or stored. Reduction and recovery bands reflect typical results of digitising document-driven CQV programmes; your basis will differ. We'll build the rigorous version with your own data during evaluation.

Transparent assumptions

How the numbers are computed

Admin hours
Engineers × 1,800 productive hours/year × your admin share. The 60% reduction reflects automating traceability maintenance, transcription, report assembly and signature routing — the tasks Rowsys removes outright.
Delay exposure
Projects/year × readiness-driven delay days × your per-day value. This is the value at stake, not a promised saving.
Recovery band
10–25% is a deliberately conservative range for delay attributable to documentation, visibility and approval friction — the portion a readiness platform can actually influence.