TOOL-02 · ROI Calculator
What is the coordination tax costing you?
Two numbers dominate the economics of operational readiness: the engineering hours consumed by manual administration, and the value at stake in startup delay. Put your own figures on both — every assumption is shown and adjustable.
Calculator
Your annual exposure
Recoverable administrative engineering hours per year (at a conservative 60% reduction)
Value of those hours at your loaded rate
Startup-delay value at stake across your annual programme
Indicative value of recovering 10–25% of readiness-driven delay
Estimates only, computed in your browser from your inputs — nothing is sent or stored. Reduction and recovery bands reflect typical results of digitising document-driven CQV programmes; your basis will differ. We'll build the rigorous version with your own data during evaluation.
Transparent assumptions
How the numbers are computed
- Admin hours
- Engineers × 1,800 productive hours/year × your admin share. The 60% reduction reflects automating traceability maintenance, transcription, report assembly and signature routing — the tasks Rowsys removes outright.
- Delay exposure
- Projects/year × readiness-driven delay days × your per-day value. This is the value at stake, not a promised saving.
- Recovery band
- 10–25% is a deliberately conservative range for delay attributable to documentation, visibility and approval friction — the portion a readiness platform can actually influence.
See the method in practice
Want these numbers with rigour instead of ranges?
Bring your programme's actuals to a working session — we'll build the business case with you, on your data.